Find building materials at lowest prices in 10 mins
Find the lowest prices in10 minutesHyderabad
Clyft
Concrete grades for different parts of a house

Which Grade of Concrete for a House? M15, M20, M25

Subhang Reddy3 min read

"What grade should we use?" often gets the answer "M20, like always". Under IS 456, the right answer depends on where each member is and what it is exposed to.

Grade by Part of the House

MemberTypical gradeWhy
PCC bed under footingsM10 – M15Plain concrete, level base
FootingsM25Buried in soil: moderate exposure
Plinth beamM20 – M25Near ground; follow drawing
Columns, beams, internal slabsM20 – M25Mild exposure minimum M20
Roof slab, sunshades, exterior membersM25Exposed to rain: moderate exposure
Sump, water tanksM25 – M30Watertightness, IS 3370 practice
Floor base (sub-floor)M15Plain concrete

IS 456 Minimums for RCC

ExposureMinimum gradeMax w/cMin cement
MildM200.55300 kg/m³
ModerateM250.50300 kg/m³
SevereM300.45320 kg/m³

Nominal or Design Mix?

IS 456 permits nominal mixes — fixed volume ratios such as 1:1.5:3 for M20 — only for M20 and lower. For M25 and above, the mix should be designed from trial batches for the actual materials. On house sites that usually means ready-mix concrete to a stated grade, or a mix design from a lab.

How Grade Changes the Order

GradeCement per m³
M10 (1:3:6)about 4.4 bags
M15 (1:2:4)about 6.3 bags
M20 (1:1.5:3)about 8 bags
M25 (design mix)commonly about 7–8 bags with OPC 53 and a plasticiser; about 11 if volume-batched at 1:1:2

The Short Version

M15 for plain concrete, M20 for protected RCC, M25 for footings and anything exposed to weather — with M25 and above as design mixes. Follow the grade on your drawing for each member.

Frequently Asked Questions

Which grade of concrete is used for a house?

Typically M10 or M15 for plain concrete beds and bases, M20 for slabs, beams and columns in mild exposure, and M25 for footings, exterior members and roof slabs in moderate exposure. The structural drawing sets the grade for each member.

Is M20 enough for a house?

For reinforced members in mild exposure — protected from weather — M20 is the IS 456 minimum and is widely used. Members exposed to rain or buried in soil need at least M25.

Can M25 be mixed by volume on site?

IS 456 permits nominal (volume) mixes only up to M20. M25 and above should be design mixes, typically supplied as ready-mix concrete or batched to a mix design.

Does a higher grade use more cement?

Yes. Nominal M15 uses about 6.3 bags per cubic metre and M20 about 8; M25 needs more cement, though a design mix keeps it efficient.

Which grade for a footing?

Footings are buried in soil, usually moderate exposure, so at least M25 is commonly specified under IS 456.

Quotes in about 10 minutes

Get the lowest prices in Hyderabad in just 10 minutes!

Tell us the brand, grade and quantity. Verified suppliers quote, you see the lowest, and most orders arrive within 24 hours.

Get in 10mins!

More Guides

Get the Clyft app

Compare quotes from suppliers and order in minutes.

Download on the App StoreGet it on Google Play
The Clyft app showing supplier quotes for a cement order