Anti-Termite Treatment Before Construction: How It's Done

Clyft Editorial Team3 min read

Termites live in the soil and reach a house through the gaps between floor and wall, through cracks and along services. Treating the soil before the floor goes down is the most complete protection, because afterwards that soil is sealed under concrete.

The Stages of Treatment

StageWhat is treated
1. Foundation trenchesBottom and sides of excavations, before the PCC bed
2. BackfillSoil backfilled around footings and columns, layer by layer
3. Plinth fillingTop surface of the compacted filling inside the plinth, before the floor base
4. Wall–floor junctionAlong the inside of walls at floor level
5. External perimeterSoil along the outside of the plinth after construction

Timing matters: each stage must be treated just before it is covered. Once the floor base is cast, the soil beneath cannot be reached without drilling.

Who Should Do It?

A licensed pest control operator should apply a termiticide registered for pre-construction soil treatment, at the concentration and rate specified on the product label and in IS 6313 (Part 2). Ask for:

  • The product name and registration.
  • The dilution and application rate.
  • A treatment certificate with dates and stages.
  • Any warranty offered.

On-Site Precautions

  • Do not treat when heavy rain is expected; it washes the chemical away.
  • Keep the treated surface covered soon after, or lay the floor base promptly.
  • Keep children, animals and water sources away during treatment.
  • Do not disturb treated soil afterwards; if it is disturbed, re-treat.

Beyond Chemicals

Good construction helps too:

  • A sound damp-proof course and plinth protection.
  • No wood or organic debris buried in the plinth filling.
  • Sealing gaps around pipes and conduits entering the house.
  • Treated or termite-resistant timber for door frames, or steel and uPVC frames.

The Short Version

Treat the soil in stages, each just before it is covered, using a licensed operator and a registered product to IS 6313. It is one of the cheapest items in the budget and one of the hardest to add later.

Frequently Asked Questions

When is anti-termite treatment done in construction?

In stages: on the bottom and sides of foundation trenches, on backfill around foundations, on the top of the plinth filling before the floor is laid, at the junction of walls and floor, and along the external perimeter after construction.

Which standard covers anti-termite treatment?

IS 6313 (Part 2) covers pre-constructional chemical treatment of soil against termites in buildings.

Who should do the treatment?

A licensed pest control operator using a termiticide registered for soil treatment, at the dilution and rate specified on the label and in IS 6313.

Is anti-termite treatment necessary in Hyderabad?

Termites are common in Hyderabad's soils, and woodwork such as door frames and wardrobes is vulnerable. Pre-construction treatment is inexpensive relative to the damage it prevents.

Can termite treatment be done after construction?

Post-construction treatment by drilling and injecting along walls and floors is possible, but it is more disruptive and less complete than treating the soil before the floor is laid.

Get the lowest price in Hyderabad

Cement, TMT steel and AAC blocks are three-quarters of a house's material bill. See today's Hyderabad prices before you ask for quotes.