New House Handover Checklist: What to Check Before Moving In

Subhang Reddy3 min read

Handover is the last moment the contractor is fully on site and the last payment is still unpaid. A thorough inspection now is worth far more than complaints later.

Room-by-Room Checklist

Structure and walls

  • No cracks in beams, columns, slabs
  • Wall cracks only hairline, at junctions, and noted
  • No damp patches on walls or ceilings
  • Walls plumb, corners square

Plumbing

  • Every tap gives good flow and pressure
  • No leaks at joints, under basins, at the WC
  • Drains flow freely; no water standing in bathrooms
  • Hot water works; geyser fixed securely
  • Sump, overhead tank and pump working; float switch set

Electrical

  • Every switch, socket and light works
  • Distribution board labelled; MCBs and RCCB working
  • Earthing done
  • Fans balanced, fixed to hooks

Doors and windows

  • Open, close and lock smoothly
  • No gaps letting in light or rain
  • Hardware complete

Floors and finishes

  • Floors level; tiles not hollow (tap test)
  • Grout complete; skirting fixed
  • Paint even, no patches

Waterproofing

  • Bathrooms pond-tested
  • Terrace pond-tested; outlets clear
  • Parapet coping and junctions sound

Documents to Collect

DocumentWhy
Building permission and approved plansLegal record
As-built drawingsWhere pipes and conduits run in walls and slabs
Occupancy certificate (where required)Utilities, loans, sale
Structural drawingsFuture alterations
WarrantiesFittings, waterproofing, pumps
Material test reports and cube resultsQuality record

The Short Version

Walk every room with a checklist, test water, power and waterproofing, write a snag list, keep a retention until it is cleared, and take every document — especially as-built drawings — before the contractor leaves.

Frequently Asked Questions

What should I check before taking handover of a new house?

Walls and ceilings for cracks and damp, plumbing for leaks and pressure, drains for flow, electrical points and the distribution board, doors and windows, floor levels and tiles, waterproofing on the terrace and in bathrooms, and paint finish.

What is a snag list?

A written list of defects found during inspection, given to the contractor to fix before final payment.

What documents should I collect at handover?

Approved drawings and permission, as-built drawings showing concealed pipes and conduits, the occupancy certificate where required, warranties for fittings and waterproofing, test reports, and utility documents.

Should I hold back payment until snags are fixed?

A retention, commonly around 5 percent, held until defects are fixed and the defect liability period ends, is standard practice.

When should I test waterproofing?

Before handover — by pond-testing bathrooms and the terrace if not already done, and ideally after the first heavy rain.

Quotes in about 10 minutes

Get the lowest prices in Hyderabad in just 10 minutes!

Tell us the brand, grade and quantity. Verified suppliers quote, you see the lowest, and most orders arrive within 24 hours.

Get in 10mins!

More Guides

Get the Clyft app

Compare quotes from suppliers and order in minutes.

Download on the App StoreGet it on Google Play
The Clyft app showing supplier quotes for a cement order