Power is needed from the first day of construction — for the mixer, vibrator, water pump and lights — and permanently once the family moves in. They are two different connections.
Temporary Supply for Construction
Construction sites take a temporary connection, billed at the applicable tariff, for site equipment. Plan its position so cables do not cross the working area, and protect it from rain. A diesel generator as backup prevents a power cut from stopping a slab pour.
Permanent Domestic Connection
- Complete the house wiring with a licensed electrical contractor.
- Get the wiring test certificate.
- Apply online on TGSPDCL's new service connection portal, choosing the domestic category.
- Upload documents and pay the application and security charges.
- Inspection and meter installation.
Typical Documents
| Document | Purpose |
|---|---|
| Identity proof (Aadhaar, PAN, etc.) | Applicant |
| Address proof | Applicant |
| Sale deed or ownership/occupancy proof | Property |
| Wiring test certificate | Safety of installation |
| Photographs | Where requested |
Planning the Load
| Item | Plan for |
|---|---|
| Air conditioners | One per bedroom is common in Hyderabad houses |
| Geysers | One per bathroom |
| Water pump | Sump to overhead tank |
| Kitchen | Induction, microwave, refrigerator |
| Future | Solar inverter, EV charging |
An electrician can estimate connected load from this list. Applying for too little leads to tripping and a later load enhancement application.
The Short Version
Temporary supply for the site, then a permanent TGSPDCL domestic connection with a wiring test certificate and documents, applied online — sized for the air conditioners and pumps a Hyderabad house actually runs.