Building permission process in Hyderabad

Building Permission in Hyderabad: The BuildNow Process

Clyft Editorial Team4 min read

Every house in Hyderabad needs permission before construction starts, and the rules sit on top of everything else in this guide — setbacks decide your built-up area, height limits decide how many floors, and an unapproved layout can stop a permission entirely. Here is how the process works on BuildNow, and what to sort out before you apply.

What Is BuildNow?

BuildNow is the Telangana government's unified online system for building and layout approvals, covering GHMC, HMDA, DTCP areas and the state's municipalities. It replaced the earlier TS-bPASS system (renamed TG-bPASS in 2024) for new applications; permissions already issued under TS-bPASS remain valid. The portal checks submitted drawings against the building rules automatically, which shortens approval for straightforward residential plans.

Because procedures and fees are revised from time to time, confirm the current requirements on the portal and with your architect before you apply.

Which Approval Route Applies to Your House?

Plot and buildingRouteWhat it means
Up to 75 sq yards, ground or G+1Registration onlyOnline registration for a token fee; no separate permission
Up to 500 m², up to 10 m heightInstant approvalApproval on self-certification that the plan complies
Above 500 m² or above 10 mSingle windowFull scrutiny with the required NOCs

Most independent houses on Hyderabad's common 150–300 sq yard plots (125–250 m²), up to G+2, fall in the instant approval route — provided the plan genuinely follows the rules, because the owner and the licensed technical person certify that it does.

What Do You Need Before You Apply?

  1. Clear title. Sale deed and an encumbrance certificate showing no dues or disputes.
  2. An approved layout, or regularisation. Plots in unapproved layouts generally need regularisation under the Layout Regularisation Scheme before building permission. See LRS in Telangana.
  3. Property tax details, where the plot is assessed.
  4. A licensed technical person — architect or engineer — to prepare architectural and structural drawings that follow the building rules.
  5. Setbacks and height checked against the rules for your plot size and road width. See building setbacks in Hyderabad.

What Fees Are Payable?

Fees vary with plot area, built-up area and location, and are calculated on the portal. They typically include:

  • Building permit and scrutiny fees.
  • Development charges.
  • A labour cess of 1 percent of the estimated construction cost, under the Building and Other Construction Workers' Welfare Cess Act.
  • Portal or user charges.

Budget for permission costs alongside design fees in the extras a per sq ft construction rate leaves out.

What Happens After Approval?

  • Display the permission at the site.
  • Build as approved. Deviations from setbacks, height or floors can lead to penalties or demolition. Self-certified approvals are subject to later inspection.
  • Keep records — approved drawings, structural design and inspection notes — for completion and future sale.
  • Plan utility connections for water and electricity, which need the approval details.

Common Mistakes

MistakeConsequence
Starting work before approvalPenalties; work can be stopped
Buying a plot in an unapproved layout without regularisationPermission may not be issued
Ignoring setbacks to gain areaViolation found later; demolition risk, problems on sale
Adding a floor not in the permissionUnauthorised construction
Using drawings not by a licensed personApplication rejected

The Short Version

Apply through BuildNow with drawings from a licensed architect or engineer. Most houses up to 10 m on plots up to 500 m² get instant approval on self-certification — which makes it your responsibility that the plan follows the rules. Sort out title, layout approval and setbacks first, budget the fees, and build exactly what was approved.

Frequently Asked Questions

How do I get building permission in Hyderabad?

Apply online through BuildNow, Telangana's unified building and layout approval portal at buildnow.telangana.gov.in, which replaced TS-bPASS. Your architect or licensed technical person prepares the drawings and uploads them with your ownership documents, and the route — registration, instant approval or single window — depends on plot size and building height.

Do small plots need building permission?

Plots up to 75 square yards building ground or G+1 only need online registration on BuildNow, for a token fee, rather than a full permission. Check the current rules on the portal before you start.

What is instant approval?

For plots up to 500 square metres and buildings up to 10 metres high, approval is granted online on self-certification by the owner and a licensed technical person that the plan follows the building rules. Authorities can inspect later, and a false certification has consequences.

What documents are needed for building permission?

Typically the sale deed, an encumbrance certificate, property tax receipt where applicable, the approved layout or LRS details for the plot, architectural and structural drawings by a licensed technical person, and self-certification declarations.

Is a TS-bPASS approval still valid?

Permissions already sanctioned under TS-bPASS (later TG-bPASS) remain valid. New applications go through BuildNow.

Get the lowest price in Hyderabad

Cement, steel and blocks delivered across Hyderabad in 24 hours, from suppliers who bid for your order.

More Guides

Get the Clyft app

Compare quotes from suppliers and order in minutes.

Download on the App StoreGet it on Google Play
The Clyft app showing supplier quotes for a cement order